Business System > Five Characteristics > Energy and Environmental Protection
Soil Remediation Project at the Former Site of Hangzhou Iron and Steel Plant Park
source: Author: Release time:2024-07-25
The soil remediation project for the Hangzhou Iron and Steel Former Site Park, constructed by WISDRI, employs technologies such as thermal desorption, leaching, brick kiln co-processing, cement kiln co-processing, vertical and horizontal barrier treatment for different types of pollution. The project remediated a total of 124,000 m3 of contaminated soil, covering an area of ​​33,000 m2. It significantly improved the soil environment of the site, provided strong support for the construction of the Beijing-Hangzhou Grand Canal National Park and the China Grand Canal Cultural Belt, witnessed the transformation of an old industrial site into a new urban landmark, and promoted the protection of the Yangtze River.
Stock information
  • MCC A股 [601618]
  • MCC H股 [01618]

MCC

轻推
Contact Us | Site Map | Terms of Use | Privacy Policy |
phone:010-59869999 fax:010-59869988 Address:28 Shuguang Xili, Chaoyang District, Beijing
All rights reserved by MCC Group © 2021 Jinggongwang Anbei No. 110401300039 Beijing ICPB 14039545-1 Beijing ICPB No. 2020047078-1