Position: Homepage > Focus > Subsidairy News
MCC17 Wins Bidding for Suzhou Economic Development District Biological Medicine Science Park EPC Project
CopyFrom: Date:13 February 2018
+ . -

  On February 12th, the MCC17 Group won the bidding for the Biological Medicine Science Park EPC General Contracting Project in the Economic and Technological Development District of Suzhou City, Anhui Province.

  Located in Economic and Technological Development District of Suzhou City, the project is planned to cover an overall floor area of about 273 mu and a total building area of about 140,000 m2. The total construction period is 1,000 calendar days. The reconnaissance design includes reconnaissance services within the scope of the red line, buildings, roads and greening, deepening and optimization of planning and preliminary design of all supporting facilities, construction drawing design and drawing review. The construction contents include all individual structures, matched auxiliary rooms, all water supply and drainage, electric power, communication, intelligentization, firefighting, parking lots and bicycle shed construction, and all supporting facilities in the park. The equipment and material purchasing include all power equipment, corollary equipment and so on in the park.


MCC

轻推
中科汇联承办,easysite内容管理系统,portal门户,舆情监测,搜索引擎,政府门户,信息公开,电子政务